Preparing and installing

by

Today we installed our temporary studio in De Bewaerschole and prepared the working area.

print_test_ready

print_test_ready

The two test-monoprints we made this evening.

We ware special masks as a protection against the spray paint.

spray_box

spray_box

The 2-d version of the spray-box we use to protect the floor.

Pooring the dry sand into the sieve.

drying_sand

drying_sand

We used some force, the stove, to dry the sand.

Marinus van Dijke form the Bewaerschole visits our workplace.

preparations1

preparations1

Almost ready to start.

installing_studio

installing_studio

We managed to create a great studio in the Bewaerschole.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: